Speaker Automation Solutions

Speaker Automation Solutions

Speaker automation solution

JiuJu Automation - Speaker Automation Total Solution
Miniature Speaker Automation Line
Miniature Speaker Automation LineAiming at TWS/wearing device special miniature speakers, it integrates high-precision visual positioning (±0.01mm), piezoelectric dispensing, laser welding and other core processes to realize full automation of magnetic circuit assembly, sound film lamination, solder joint inspection and electrical performance testing. The single production line has a beat of 0.8s/piece and a daily capacity of 120,000 pieces, which saves 85% manpower compared with the manual production line, and the yield rate has increased from 95% to 99.8%, and it is suitable for the production of mainstream TWS earphone speakers such as AirPods, Huawei FreeBuds, and so on.
Small speaker automated production line
Small speaker automated production lineSuitable for headphones/smart speakers/tv speakers special small speakers, equipped with AI visual defect detection system (can identify 0.02mm tiny defects), fully automatic air tightness testing (pressure accuracy ± 0.01KPa), automatic winding and other modules, support multi-specification flexible production, changeover time <25 minutes. The production line adopts modularized design, which can be flexibly expanded according to customer's capacity demand.
Medium-sized speaker automation production line
Medium-sized speaker automation production lineFor car/home audio special medium-sized speakers, integrating six-axis collaborative robots, high-precision force-controlled assembly (±0.05N), full-frequency acoustic testing and other technologies, supporting eight specifications of speakers co-production, to meet the demand for small-lot, multi-variety production of car audio and smart home speakers. The production line is equipped with MES system, realizing real-time monitoring of production data and automatic warning of quality abnormality.

What do I need to pay attention to when installing and commissioning speaker automation equipment? Installation guidelines and commissioning points

Q: What do I need to pay attention to in the installation and commissioning of speaker automation equipment? How to ensure the correct installation and normal operation of the equipment?

Speaker Automation

A: The installation and commissioning of speaker automation equipment is a key link to ensure the normal operation of the equipment, need to pay attention to the following matters:
Installation site requirements:
1. The site should be dry and well-ventilated, avoiding humid and dusty environments.
2. The floor should be level, firm and capable of supporting the weight of the equipment.
3. Adequate operating and maintenance space shall be provided around the equipment.
4. It should be kept away from sources of strong magnetic field interference, such as large motors and transformers.

Power supply configuration requirements:
1. The power supply voltage should meet the requirements of the equipment, usually AC220V or AC380V.
2. The capacity of the power supply shall meet the maximum power requirements of the equipment and avoid voltage fluctuations.
3. Dedicated power switches and protection devices shall be provided.
4. The grounding wire shall be reliably connected to ensure the safety of equipment and personnel.

Safety and security measures:
1. Installation of safety warning signs to remind attention to safe operation.
2. Installation of safety barriers or nets to prevent persons from accidentally entering hazardous areas.
3. Installation of an emergency stop device to ensure rapid shutdown in case of emergency.

Debugging Points:
1. No-load debugging: in the case of not placing the workpiece, test whether the various functions of the equipment is normal.
2. Load commissioning: production tests using standard workpieces to adjust equipment parameters.
3. Performance testing: testing the positioning accuracy, repeatability, production beat and other performance indicators of the equipment.
4. Safety test: Test the safety protection devices for proper functioning.

Installation and commissioning should be carried out by professional and technical personnel to ensure operational safety and commissioning quality. After the commissioning is completed, operators should be trained to familiarize themselves with the operation of the equipment and safety precautions.

JiuJu Automation-Automatic production line for audio speakers

Core view:

Core point: Speaker automation equipment installation and commissioning need to pay attention to site requirements, power supply configuration, safety protection and commissioning points. Professional installation and commissioning and operator training is the key to ensure the normal operation of the equipment.

Jiuju Automation

JiuJi Automation Advantage:

Frequently Asked Questions FAQ

Click a question to expand the answer
01What must the customer prepare before the equipment arrives?
Prepare along four lines: power (capacity, circuits, earthing), air (pressure, flow, dryness), floor (load capacity, levelness, vibration isolation) and space (entry route, operating and maintenance clearance).If any one of the four is not in place, the equipment cannot be started even after it arrives and the whole schedule slips. We recommend issuing a site-readiness checklist as soon as the contract is signed rather than confirming it just before dispatch.
02What are the power requirements?
380 V three-phase as standard, 220 V for some dedicated machines, with voltage stabilisation and a dedicated circuit breaker.Magnetizers are pulsed high-current loads: give them a dedicated circuit with adequate breaker capacity and do not share a feed with precision inspection equipment. Total line power is calculated from the actual configuration and stated at the proposal stage, not estimated from experience.
03What are the compressed-air requirements?
0.5 to 0.8 MPa, with dried air provided at the site.Stations with pneumatic grippers and vacuum nozzles are sensitive to moisture and oil: condensate clogs nozzles and slows cylinder response, showing up as intermittent dropped parts. Size the dryer and filters to actual air consumption; this is not the item to economise on.
04What should be checked about floor loading?
Riveting and press-type machines are heavy; slab load capacity and vibration isolation must be confirmed in advance, especially for upper-floor workshops.Levelness matters as well: long lines are sensitive to floor level differences, and excessive variation deforms the frame and shifts locating accuracy. Local reinforcement or isolation pads may be needed; retrofitting afterwards is expensive.
05Are there temperature and humidity requirements?
Micro-speaker assembly is sensitive to static and dust, so a clean, ESD-protected environment is recommended. Dispensing is more sensitive still, because adhesive viscosity varies with temperature and directly affects the volume dispensed.If the workshop has no temperature and humidity control, say so at the proposal stage so that compensation can be designed into the equipment or the process window adjusted.
06What should be checked on the entry route in advance?
Three points: door width and height, turning radius along the route, and lift car dimensions and rated load.Line equipment ships in sections, and section dimensions are marked on the layout drawing; check the route against the largest section envelope. Narrow factory doors and small goods lifts are common blockers, and modifying them costs far more than planning ahead.
07How many stages does installation and commissioning involve?
Four: positioning and levelling, electrical and pneumatic connection, powered trial running of individual machines, and linked commissioning of the whole line.The first two are the foundation; if they are done badly everything after is re-adjusted. The third verifies machine motions and safety interlocks; only the fourth addresses cycle time and interlock logic. Skip any step and it comes back as rework.
08What does the customer need to provide during commissioning?
Three things: incoming material to the real specification (samples cannot stand in for production stock), the team leaders who will actually run the equipment taking part, and a clear acceptance standard with a named decision-maker.The second is the one most often overlooked: if the operators are not involved in commissioning, they will adjust parameters to their own habits once production starts and undo the validated window.
09How long does commissioning take?
Typically 45 to 120 calendar days for a complete line, across seven stages from requirements review to volume validation; manufacturing and in-house debugging account for the largest share.On-site installation and commissioning is one of those stages, and its duration is confirmed by the number of sections and process complexity. A single machine follows the sample trial route, with a trial period of 3 to 10 working days.
10How should acceptance be organised?
Around four metrics: cycle-time attainment, yield, OEE and changeover time, with the contract stating how each is measured, how many samples are used and who decides.Volume validation should be a continuous 72-hour assessment covering changeovers and fault handling. Signing off after a small batch under ideal conditions is hard to revisit later.
11How should operator training be organised?
In three tiers: operators (loading, changeover, alarm handling), maintenance (daily checks, consumable replacement, air and adhesive circuit care) and supervisors (dashboards and traceability queries).Training must take place at real production pace, hands-on. A single demonstration during commissioning guarantees operating errors once production begins.
12What are the common causes of rework?
Four: floor level differences deforming the frame, moisture in the air supply slowing pneumatic components, incoming material differing from the trial sample, and voltage fluctuation causing locating drift.None of these lies within the machine itself, yet they are most often blamed on the equipment. The site-readiness checklist exists to eliminate them in advance.

Jiuju Automation is an SRDI “Little Giant” Enterprise and has specialised in speaker automated assembly for 16 years, serving more than 2,500 customers. The company holds 256 technical patents and operates a 10,000 m² production base, offering one-stop solutions from standalone equipment to complete automated lines. Jiuju speaker automated assembly lines use high-precision vision positioning (±0.01 mm), AI-based inspection and fast changeover (<25 minutes), raising production efficiency by 300%+ and achieving a product yield of 99.8% with a 60% reduction in overall cost.

JiuJi Automation-Electroacoustic Equipment

Contact Information:

National Service Hotline:400-626-8699

Technical Consultation:134-2897-6919

Product Consultation:180-0255-6337

Company Email:sam@szjiuju.com / zhouxin@szjiuju.com

Shenzhen Address: Building B1, Juji Technology Industrial Park, Houting Community, Shajing Street, Bao'an District, Shenzhen

Dongguan Address: Building B1, Songhu Zhigu Industrial Park, Liaobu Town, Dongguan

Previous. NEXT STORY.

Jiuju Automation · Factory: Dongguan, Guangdong, China · Company: Shenzhen, Guangdong, China · Tel: 400-626-8699