JiuJu Automation focuses on the intelligent upgrading of the whole process of speakers, integrating the four core technologies of visual inspection, precision assembly, AI quality inspection and data traceability to provide customized solutions for TWS headphones, car audio, multimedia smart audio speakers, etc., and achieve production capacity increase of 300%+, yield rate of 99.8%, and reduce the comprehensive cost of 60%, completely solving the pain points of the industry, such as manual dependence, stable quality control and delivery cycle. dependence, unstable quality control, long delivery cycle and other industry pain points. Based on the product characteristics and production scenarios of speakers, it creates a full-process automation system from the entry of raw materials to the release of finished products from the warehouse, covering the three major categories of micro, small and medium-sized, and adapting to the needs of multi-specification and multi-batch production.
How does a 40-metre speaker assembly line fit into five truckloads?
In November 2026 a complete speaker assembly line roughly 40 metres long was loaded at the Jiuju plant and shipped in five truckloads after being split into modules. What follows records the loading in the order it happened.
This line is a typicalSpeaker automated assembly line, with split points set at station boundaries: magnetic circuit, diaphragm, riveting, terminal insertion, dispensing and inspection each form their own section, and the cabling and air lines between sections are left with slack so the line can be reassembled on site.
The modules were wrapped in stretch film with corner protectors and parked in the dispatch area awaiting loading. Five truckloads were needed because individual modules exceed the size of the standard doorways, so some units had to leave through the lifting opening on the outside of the plant; short moves were handled by forklift and hand, longer ones by flatbed truck and container.
Loading followed module size and centre of gravity, with internal bracing and lashing inside each case to limit movement in transit. The five vehicles are numbered in sequence and matched item by item against the packing list; doors were closed and sealed after loading. The images on this page record three of the vehicles (Truck 1, Truck 2 and Truck 3); the others followed the same procedure.
Jiuju loudspeaker line loading and shipment
Station composition is adjusted to the speaker type: automotive and audio speakers differ in the magnetic circuit, diaphragm and inspection stages. Details are inAutomotive Speaker Automation Production Line; to see line layout and station interfaces by product type, seeSpeaker Automation SolutionsThe
This page covers the loading stage only; equipment models, capacity and lead times are not included. Configuration and delivery arrangements are subject to confirmation by our sales team.
To learn about station configuration and delivery arrangements for a complete line, call 400-626-8699 for advice, orbook a visit to our Shenzhen or Dongguan plantand see the assembly line running on site. Jiuju has specialised in loudspeaker assembly equipment for 16 years.