{"id":7886,"date":"2026-11-21T08:49:10","date_gmt":"2026-11-21T00:49:10","guid":{"rendered":"https:\/\/www.jiujuauto.com\/?p=7886"},"modified":"2026-11-23T09:33:44","modified_gmt":"2026-11-23T01:33:44","slug":"%e5%96%87%e5%8f%ad%e8%a3%85%e9%85%8d%e7%ba%bf%e9%aa%8c%e6%94%b6%e8%a6%81%e7%9c%8b%e5%93%aa%e5%87%a0%e9%a1%b9%ef%bc%9f%e4%b9%85%e5%b7%a8%e7%bb%99%e7%9a%84%e6%a3%80%e6%9f%a5%e9%a1%ba%e5%ba%8f","status":"publish","type":"post","link":"https:\/\/www.jiujuauto.com\/fr\/faq\/7886.html","title":{"rendered":"R\u00e9ception d'une ligne d'assemblage de haut-parleurs"},"content":{"rendered":"<p class=\"wp-block-paragraph\">La r\u00e9ception n'est pas une checklist, c'est une reproduction. Si la machine tourne bien quand le fournisseur est l\u00e0 et pas une fois reprise, c'est que les conditions n'ont pas \u00e9t\u00e9 consign\u00e9es. L'ordre compte plus que la liste : statique, puis dynamique, enfin les donn\u00e9es.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component.jpg\" alt=\"Jiuju Ensembles magn\u00e9tiques pour haut-parleurs finis\" class=\"wp-image-7839\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">D'abord le statique : que regarder ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les surfaces de r\u00e9f\u00e9rence, les jeux et les protections. Si la surface de r\u00e9f\u00e9rence porte des traces d'usinage, si les \u00e9l\u00e9ments de positionnement sont interchangeables, si le jeu entre pi\u00e8ces mobiles et fixes est r\u00e9gulier. Les protections, c'est rideau lumineux, arr\u00eat d'urgence et verrouillage : elles ne produisent rien, mais elles sont la derni\u00e8re barri\u00e8re en cas de probl\u00e8me.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ensuite le dynamique : quelle diff\u00e9rence entre \u00e0 vide, avec produit et en continu ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c0 vide, on regarde si le mouvement est fluide, sans interf\u00e9rence ni bruit anormal. Avec produit, si le positionnement, la prise et le pressage sont stables. En continu, l'\u00e9chauffement, l'usure et la d\u00e9rive du cycle. Les trois \u00e9tapes sont n\u00e9cessaires ; \u00e0 vide seul, ce n'est pas une r\u00e9ception.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment consigner les donn\u00e9es pour qu'elles comptent ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Le cycle se prend en moyenne sur le lot, pas au plus rapide sur une pi\u00e8ce. Le rendement se calcule sur les pi\u00e8ces engag\u00e9es et produites, pas en divisant les bonnes par les contr\u00f4l\u00e9es. Les arr\u00eats se enregistrent par cat\u00e9gorie : sans distinguer panne, changement de mati\u00e8re et attente, aucune am\u00e9lioration n'est possible. Une fois ces trois d\u00e9finitions fig\u00e9es, les chiffres deviennent comparables.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B.jpg\" alt=\"Post de travail d&#039;assemblage des circuits magn\u00e9tiques des haut-parleurs Jiuju\" class=\"wp-image-7865\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Quels documents examiner ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Plans, tableau des param\u00e8tres, liste de pi\u00e8ces de rechange, p\u00e9riodicit\u00e9 de maintenance. Le tableau des param\u00e8tres est le plus souvent n\u00e9glig\u00e9 : si les param\u00e8tres du PLC ne sont pas remis, un changement d'op\u00e9rateur ne permet plus de reproduire. Sur la liste de rechange, v\u00e9rifier le d\u00e9lai des pi\u00e8ces critiques ; sans pi\u00e8ce d'usure en stock, un arr\u00eat devient une attente de livraison.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Que faire en cas de r\u00e9ception non conforme ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">On distingue deux cas. Ce qui est corrigeable est consign\u00e9 comme point de correction, avec d\u00e9lai et nouvelle v\u00e9rification ; ce qui ne l'est pas est accept\u00e9 en d\u00e9rogation, avec un p\u00e9rim\u00e8tre d'impact explicite. Les deux doivent \u00eatre \u00e9crits : un accord oral finit en litige apr\u00e8s la mont\u00e9e en cadence. Une \u00e9tape est souvent saut\u00e9e : consigner s\u00e9par\u00e9ment corrections et d\u00e9rogations. La correction se cl\u00f4t apr\u00e8s v\u00e9rification r\u00e9ussie ; la d\u00e9rogation exige une signature.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview.jpg\" alt=\"Jiuju Vue panoramique de l&#039;atelier de la cha\u00eene de montage automatis\u00e9e des haut-parleurs\" class=\"wp-image-7866\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Quel point est le plus souvent oubli\u00e9 ?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La m\u00e9thode de jugement de la premi\u00e8re pi\u00e8ce. La plupart des r\u00e9ceptions v\u00e9rifient si la premi\u00e8re pi\u00e8ce est conforme, sans regarder sur quoi repose ce jugement. Ce qui d\u00e9finit la conformit\u00e9, qui juge, et o\u00f9 c'est consign\u00e9 : sans ces trois \u00e9l\u00e9ments, le litige revient en production. Et un litige, une fois ouvert, impose souvent un arr\u00eat de ligne et une ren\u00e9gociation, bien plus co\u00fbteux qu'une demi-journ\u00e9e de r\u00e9ception.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La r\u00e9ception se fait sur la ligne compl\u00e8te ; v\u00e9rifier des machines isol\u00e9es ne suffit pas.<a href=\"https:\/\/www.jiujuauto.com\/fr\/centre-de-produits\/automotive-speaker-automated-production-line\/4511.html\/\">Ligne de production automatis\u00e9e de haut-parleurs automobiles<\/a>ce type de ligne compte le plus d'interfaces : hauteur de transfert entre postes, \u00e9change de palettes et synchronisation des cycles doivent \u00eatre vus ensemble.<a href=\"https:\/\/www.jiujuauto.com\/fr\/centre-de-produits\/automatic-audio-speaker-production-line\/4512.html\/\">Ligne de production automatis\u00e9e de haut-parleurs audio<\/a>sa capacit\u00e9 de changement de mod\u00e8le se v\u00e9rifie en demandant au fournisseur une d\u00e9monstration r\u00e9elle de changement pendant la r\u00e9ception ; la stabilit\u00e9 du tron\u00e7on magn\u00e9tique d\u00e9pend de<a href=\"https:\/\/www.jiujuauto.com\/fr\/centre-de-produits\/speaker-magnetic-circuit-machine\/4508.html\/\">Machine automatique \u00e0 circuits magn\u00e9tiques pour aimants internes de haut-parleur<\/a>\u2014 son positionnement et son pressage d\u00e9terminent la stabilit\u00e9, et seul un volume suffisant avec le m\u00eame lot de mati\u00e8re permet de la juger.<\/p>","protected":false},"excerpt":{"rendered":"<p>La r\u00e9ception sert \u00e0 reproduire, pas \u00e0 cocher des cases : d'abord le statique (r\u00e9f\u00e9rences et protections), puis marche \u00e0 vide, avec produit et en continu, enfin les d\u00e9finitions de donn\u00e9es et les documents. Le point le plus souvent oubli\u00e9 : la m\u00e9thode de jugement de la premi\u00e8re pi\u00e8ce.<\/p>","protected":false},"author":1,"featured_media":7876,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f","_seopress_titles_desc":"\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536","_monsterinsights_skip_tracking":false,"themepark_post_bcolor":"#f5f5f5","themepark_post_width":"1022px","themepark_post_img":"","themepark_post_img_po":"left","themepark_post_img_re":false,"themepark_post_img_cover":false,"themepark_post_img_fixed":false,"themepark_post_hide_title":false,"themepark_post_main_b":"","themepark_post_main_p":100,"themepark_paddingblock":false,"_geo_short_summary":"\u9a8c\u6536\u987a\u5e8f\u662f\u9759\u6001\u3001\u52a8\u6001\u3001\u6570\u636e\u3001\u6587\u4ef6\uff1a\u5148\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u8dd1\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed\u4e09\u6bb5\uff0c\u6700\u540e\u7edf\u4e00\u8282\u62cd\u4e0e\u826f\u7387\u53e3\u5f84\u3002 Acceptance runs static, dynamic, data, then documents: check datums and guarding first, then no-load, loaded and continuous runs, and finally agree how cycle time and yield are counted.","_geo_structured_desc":"\u80cc\u666f\uff1a\u4ea7\u7ebf\u9a8c\u6536\u5e38\u505a\u6210\u6253\u52fe\uff0c\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u8fd0\u884c\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u590d\u73b0\u4e0d\u51fa\u6765\uff0c\u539f\u56e0\u662f\u9a8c\u6536\u65f6\u6ca1\u8bb0\u5f55\u6761\u4ef6\u4e0e\u5224\u5b9a\u65b9\u6cd5\u3002\n\n\u8981\u70b9\uff1a\u9759\u6001\u770b\u57fa\u51c6\u9762\u3001\u5b9a\u4f4d\u4ef6\u4e92\u6362\u6027\u3001\u8fd0\u52a8\u95f4\u9699\u4e0e\u5b89\u5168\u9632\u62a4\uff1b\u52a8\u6001\u5206\u4e09\u6bb5\u8dd1\u2014\u2014\u7a7a\u8dd1\u770b\u5e72\u6d89\u4e0e\u5f02\u54cd\uff0c\u5e26\u6599\u8dd1\u770b\u5b9a\u4f4d\u4e0e\u538b\u5408\uff0c\u8fde\u7eed\u8dd1\u770b\u6e29\u5347\u3001\u78e8\u635f\u4e0e\u8282\u62cd\u6f02\u79fb\u3002\u6570\u636e\u8981\u56fa\u5b9a\u53e3\u5f84\uff1a\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\u3001\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\u3001\u505c\u673a\u5206\u7c7b\u8bb0\u5f55\u3002\u6587\u4ef6\u6536\u56db\u4efd\uff1a\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u53c2\u6570\u8868\u4e0d\u4e0a\u4ea4\u4f1a\u5bfc\u81f4\u6362\u4eba\u8c03\u4e0d\u51fa\u3002\u9996\u4ef6\u786e\u8ba4\u8981\u6709\u5224\u5b9a\u6807\u51c6\u3001\u5224\u5b9a\u4eba\u548c\u8bb0\u5f55\u4f4d\u7f6e\u3002\n\n\u7ed3\u8bba\uff1a\u6574\u7ebf\u9a8c\u6536\u800c\u975e\u5355\u673a\u9a8c\u6536\uff0c\u6362\u578b\u80fd\u529b\u8981\u73b0\u573a\u6f14\u793a\uff0c\u7a33\u5b9a\u6027\u8981\u7528\u540c\u4e00\u6279\u6765\u6599\u8dd1\u591f\u6570\u91cf\u3002\n\nBackground: Line acceptance often turns into ticking boxes. The line runs fine while the supplier is on site, then cannot be reproduced after handover, because the conditions and the accept-or-reject method were never recorded.\n\nKey points: Static checks cover datum faces, interchangeability of locators, motion clearances and safety guarding. Dynamic checks run in three stages - no-load for interference and noise, loaded for location and pressing, continuous for temperature rise, wear and cycle-time drift. Data needs fixed definitions: cycle time as a batch average, yield as output over input, downtime logged by category. Four documents should be handed over: drawings, a parameter table, a spare-parts list and a maintenance schedule; without the parameter table, a new operator cannot set the line up. First-article approval needs a written criterion, a named approver and a place to record it.\n\nConclusion: Accept the whole line, not single machines. Changeover capability should be demonstrated on site, and stability proven with enough units from one incoming lot.\n","_geo_faqs":"[{\"question\":\"\u9a8c\u6536\u8981\u8dd1\u591a\u4e45\u624d\u7b97\u591f\uff1f \\\/ How long should acceptance testing run?\",\"answer\":\"\u6309\u6279\u91cf\u4e0e\u8282\u62cd\u5b9a\uff0c\u81f3\u5c11\u8986\u76d6\u4e00\u4e2a\u5b8c\u6574\u6279\u6b21\uff0c\u5e76\u5305\u542b\u4e00\u6b21\u6362\u578b\uff0c\u624d\u80fd\u770b\u51fa\u7a33\u5b9a\u6027\u3002 \\\/ Set it by batch size and cycle time, and cover at least one complete batch including a changeover, or stability will not show.\"},{\"question\":\"\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u4e0d\u6b63\u5e38\uff0c\u600e\u4e48\u529e\uff1f \\\/ Fine with the supplier present, not after handover - what then?\",\"answer\":\"\u8865\u8bb0\u5f55\u6761\u4ef6\uff1a\u53c2\u6570\u3001\u6765\u6599\u6279\u6b21\u3001\u73af\u5883\u4e0e\u64cd\u4f5c\u65b9\u5f0f\u3002\u9a8c\u6536\u65f6\u6ca1\u8bb0\uff0c\u4e8b\u540e\u53ea\u80fd\u91cd\u8bd5\u3002 \\\/ Record the conditions: parameters, incoming lot, environment and operating method. If they were not written down at acceptance, the only option is to run it again.\"},{\"question\":\"\u6570\u636e\u8981\u8bb0\u54ea\u4e9b\uff1f \\\/ Which data should be recorded?\",\"answer\":\"\u8282\u62cd\u3001\u826f\u7387\u3001\u505c\u673a\u65f6\u95f4\u4e0e\u539f\u56e0\u3002\u4e09\u9879\u53e3\u5f84\u56fa\u5b9a\uff0c\u624d\u80fd\u8de8\u6279\u6b21\u6bd4\u8f83\u3002 \\\/ Cycle time, yield, and downtime with its cause. Fixed definitions are what make batches comparable.\"},{\"question\":\"\u54ea\u4e9b\u6587\u4ef6\u5fc5\u987b\u62ff\u5230\uff1f \\\/ Which documents must be handed over?\",\"answer\":\"\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u7f3a\u53c2\u6570\u8868\u6700\u9ebb\u70e6\uff0c\u6362\u4eba\u8c03\u4e0d\u51fa\u3002 \\\/ Drawings, a parameter table, a spare-parts list and a maintenance schedule. A missing parameter table hurts most: a new operator cannot set the line up.\"}]","_geo_key_points":"[\"\u9a8c\u6536\u662f\u590d\u73b0\uff0c\u4e0d\u662f\u6253\u52fe \\\/ Acceptance means reproducing, not ticking boxes\",\"\u5148\u9759\u6001\uff1a\u57fa\u51c6\u3001\u95f4\u9699\u3001\u9632\u62a4 \\\/ Static first: datums, clearances, guarding\",\"\u52a8\u6001\u8981\u8dd1\u4e09\u6bb5\uff1a\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed \\\/ Three dynamic runs: no-load, loaded, continuous\",\"\u53ea\u8dd1\u7a7a\u8dd1\u7b49\u4e8e\u6ca1\u9a8c \\\/ A no-load run alone proves nothing\",\"\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\uff0c\u4e0d\u6309\u5355\u4ef6\u6700\u5feb \\\/ Cycle time is a batch average, not the fastest unit\",\"\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\uff0c\u4e0d\u6309\u62bd\u68c0\u5408\u683c\u7387 \\\/ Yield is output over input, not sample pass rate\",\"\u505c\u673a\u8981\u5206\u7c7b\uff0c\u5426\u5219\u6539\u5584\u65e0\u4ece\u4e0b\u624b \\\/ Classify downtime or improvement has no target\",\"\u53c2\u6570\u8868\u4e0e\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u6700\u6613\u6f0f \\\/ Parameter tables and first-article criteria get missed\"]","_geo_target_audience":"\u5587\u53ed\u5236\u9020\u4f01\u4e1a\u7684\u8bbe\u5907\u7ba1\u7406\u3001\u751f\u4ea7\u6280\u672f\u4e0e\u91c7\u8d2d\u9a8c\u6536\u8d1f\u8d23\u4eba \/ Equipment managers, production technology leads and purchase acceptance owners at loudspeaker manufacturers","_geo_content_type":"","_geo_last_modified":"2026-11-20T19:30:22+08:00","_geo_version":1,"themepark_seo_title":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f\/Accepting a Speaker Assembly Line: The Check Order","themepark_seo_description":"\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002 Line acceptance is about reproducing results, not ticking boxes: static checks on datums and guarding, three dynamic runs, fixed data definitions and four documents. First-article criteria are what usually goes missing.","footnotes":""},"categories":[98],"tags":[682,182,681,683],"class_list":["post-7886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq","tag-682","tag-182","tag-681","tag-683"],"metadata":{"_thumbnail_id":["7876"],"_seopress_titles_title":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f"],"_seopress_titles_desc":["\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002"],"_seopress_analysis_target_kw":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536"],"_geo_short_summary":["\u9a8c\u6536\u987a\u5e8f\u662f\u9759\u6001\u3001\u52a8\u6001\u3001\u6570\u636e\u3001\u6587\u4ef6\uff1a\u5148\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u8dd1\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed\u4e09\u6bb5\uff0c\u6700\u540e\u7edf\u4e00\u8282\u62cd\u4e0e\u826f\u7387\u53e3\u5f84\u3002 Acceptance runs static, dynamic, data, then documents: check datums and guarding first, then no-load, loaded and continuous runs, and finally agree how cycle time and yield are counted."],"_geo_structured_desc":["\u80cc\u666f\uff1a\u4ea7\u7ebf\u9a8c\u6536\u5e38\u505a\u6210\u6253\u52fe\uff0c\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u8fd0\u884c\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u590d\u73b0\u4e0d\u51fa\u6765\uff0c\u539f\u56e0\u662f\u9a8c\u6536\u65f6\u6ca1\u8bb0\u5f55\u6761\u4ef6\u4e0e\u5224\u5b9a\u65b9\u6cd5\u3002\n\n\u8981\u70b9\uff1a\u9759\u6001\u770b\u57fa\u51c6\u9762\u3001\u5b9a\u4f4d\u4ef6\u4e92\u6362\u6027\u3001\u8fd0\u52a8\u95f4\u9699\u4e0e\u5b89\u5168\u9632\u62a4\uff1b\u52a8\u6001\u5206\u4e09\u6bb5\u8dd1\u2014\u2014\u7a7a\u8dd1\u770b\u5e72\u6d89\u4e0e\u5f02\u54cd\uff0c\u5e26\u6599\u8dd1\u770b\u5b9a\u4f4d\u4e0e\u538b\u5408\uff0c\u8fde\u7eed\u8dd1\u770b\u6e29\u5347\u3001\u78e8\u635f\u4e0e\u8282\u62cd\u6f02\u79fb\u3002\u6570\u636e\u8981\u56fa\u5b9a\u53e3\u5f84\uff1a\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\u3001\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\u3001\u505c\u673a\u5206\u7c7b\u8bb0\u5f55\u3002\u6587\u4ef6\u6536\u56db\u4efd\uff1a\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u53c2\u6570\u8868\u4e0d\u4e0a\u4ea4\u4f1a\u5bfc\u81f4\u6362\u4eba\u8c03\u4e0d\u51fa\u3002\u9996\u4ef6\u786e\u8ba4\u8981\u6709\u5224\u5b9a\u6807\u51c6\u3001\u5224\u5b9a\u4eba\u548c\u8bb0\u5f55\u4f4d\u7f6e\u3002\n\n\u7ed3\u8bba\uff1a\u6574\u7ebf\u9a8c\u6536\u800c\u975e\u5355\u673a\u9a8c\u6536\uff0c\u6362\u578b\u80fd\u529b\u8981\u73b0\u573a\u6f14\u793a\uff0c\u7a33\u5b9a\u6027\u8981\u7528\u540c\u4e00\u6279\u6765\u6599\u8dd1\u591f\u6570\u91cf\u3002\n\nBackground: Line acceptance often turns into ticking boxes. The line runs fine while the supplier is on site, then cannot be reproduced after handover, because the conditions and the accept-or-reject method were never recorded.\n\nKey points: Static checks cover datum faces, interchangeability of locators, motion clearances and safety guarding. Dynamic checks run in three stages - no-load for interference and noise, loaded for location and pressing, continuous for temperature rise, wear and cycle-time drift. Data needs fixed definitions: cycle time as a batch average, yield as output over input, downtime logged by category. Four documents should be handed over: drawings, a parameter table, a spare-parts list and a maintenance schedule; without the parameter table, a new operator cannot set the line up. First-article approval needs a written criterion, a named approver and a place to record it.\n\nConclusion: Accept the whole line, not single machines. Changeover capability should be demonstrated on site, and stability proven with enough units from one incoming lot.\n"],"_geo_faqs":["[{\"question\":\"\u9a8c\u6536\u8981\u8dd1\u591a\u4e45\u624d\u7b97\u591f\uff1f \\\/ How long should acceptance testing run?\",\"answer\":\"\u6309\u6279\u91cf\u4e0e\u8282\u62cd\u5b9a\uff0c\u81f3\u5c11\u8986\u76d6\u4e00\u4e2a\u5b8c\u6574\u6279\u6b21\uff0c\u5e76\u5305\u542b\u4e00\u6b21\u6362\u578b\uff0c\u624d\u80fd\u770b\u51fa\u7a33\u5b9a\u6027\u3002 \\\/ Set it by batch size and cycle time, and cover at least one complete batch including a changeover, or stability will not show.\"},{\"question\":\"\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u4e0d\u6b63\u5e38\uff0c\u600e\u4e48\u529e\uff1f \\\/ Fine with the supplier present, not after handover - what then?\",\"answer\":\"\u8865\u8bb0\u5f55\u6761\u4ef6\uff1a\u53c2\u6570\u3001\u6765\u6599\u6279\u6b21\u3001\u73af\u5883\u4e0e\u64cd\u4f5c\u65b9\u5f0f\u3002\u9a8c\u6536\u65f6\u6ca1\u8bb0\uff0c\u4e8b\u540e\u53ea\u80fd\u91cd\u8bd5\u3002 \\\/ Record the conditions: parameters, incoming lot, environment and operating method. If they were not written down at acceptance, the only option is to run it again.\"},{\"question\":\"\u6570\u636e\u8981\u8bb0\u54ea\u4e9b\uff1f \\\/ Which data should be recorded?\",\"answer\":\"\u8282\u62cd\u3001\u826f\u7387\u3001\u505c\u673a\u65f6\u95f4\u4e0e\u539f\u56e0\u3002\u4e09\u9879\u53e3\u5f84\u56fa\u5b9a\uff0c\u624d\u80fd\u8de8\u6279\u6b21\u6bd4\u8f83\u3002 \\\/ Cycle time, yield, and downtime with its cause. Fixed definitions are what make batches comparable.\"},{\"question\":\"\u54ea\u4e9b\u6587\u4ef6\u5fc5\u987b\u62ff\u5230\uff1f \\\/ Which documents must be handed over?\",\"answer\":\"\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u7f3a\u53c2\u6570\u8868\u6700\u9ebb\u70e6\uff0c\u6362\u4eba\u8c03\u4e0d\u51fa\u3002 \\\/ Drawings, a parameter table, a spare-parts list and a maintenance schedule. A missing parameter table hurts most: a new operator cannot set the line up.\"}]"],"_geo_key_points":["[\"\u9a8c\u6536\u662f\u590d\u73b0\uff0c\u4e0d\u662f\u6253\u52fe \\\/ Acceptance means reproducing, not ticking boxes\",\"\u5148\u9759\u6001\uff1a\u57fa\u51c6\u3001\u95f4\u9699\u3001\u9632\u62a4 \\\/ Static first: datums, clearances, guarding\",\"\u52a8\u6001\u8981\u8dd1\u4e09\u6bb5\uff1a\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed \\\/ Three dynamic runs: no-load, loaded, continuous\",\"\u53ea\u8dd1\u7a7a\u8dd1\u7b49\u4e8e\u6ca1\u9a8c \\\/ A no-load run alone proves nothing\",\"\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\uff0c\u4e0d\u6309\u5355\u4ef6\u6700\u5feb \\\/ Cycle time is a batch average, not the fastest unit\",\"\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\uff0c\u4e0d\u6309\u62bd\u68c0\u5408\u683c\u7387 \\\/ Yield is output over input, not sample pass rate\",\"\u505c\u673a\u8981\u5206\u7c7b\uff0c\u5426\u5219\u6539\u5584\u65e0\u4ece\u4e0b\u624b \\\/ Classify downtime or improvement has no target\",\"\u53c2\u6570\u8868\u4e0e\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u6700\u6613\u6f0f \\\/ Parameter tables and first-article criteria get missed\"]"],"_geo_target_audience":["\u5587\u53ed\u5236\u9020\u4f01\u4e1a\u7684\u8bbe\u5907\u7ba1\u7406\u3001\u751f\u4ea7\u6280\u672f\u4e0e\u91c7\u8d2d\u9a8c\u6536\u8d1f\u8d23\u4eba \/ Equipment managers, production technology leads and purchase acceptance owners at loudspeaker manufacturers"],"_geo_last_modified":["2026-11-20T19:30:22+08:00"],"_geo_version":["1"],"themepark_seo_title":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f\/Accepting a Speaker Assembly Line: The Check Order"],"themepark_seo_description":["\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002 Line acceptance is about reproducing results, not ticking boxes: static checks on datums and guarding, three dynamic runs, fixed data definitions and four documents. First-article criteria are what usually goes missing."],"_edit_last":["1"],"themepark_seo_keyword":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u3001\u4ea7\u7ebf\u9a8c\u6536\u6807\u51c6\u3001\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u3001\u8bbe\u5907\u9a8c\u6536"],"_edit_lock":["1795395381:1"],"views":["119"],"_headinfo":["a:1:{i:0;a:27:{s:6:\"module\";s:1:\"1\";s:7:\"navtext\";i:14;s:4:\"navb\";b:0;s:5:\"navpd\";i:15;s:5:\"navc1\";s:0:\"\";s:5:\"navc2\";s:7:\"#ffffff\";s:5:\"navc3\";s:7:\"#000000\";s:5:\"navc4\";s:0:\"\";s:5:\"navc5\";s:7:\"#000000\";s:5:\"navc6\";i:100;s:5:\"topc1\";s:0:\"\";s:5:\"topc2\";s:0:\"\";s:4:\"topf\";s:0:\"\";s:6:\"seach1\";s:0:\"\";s:6:\"seach2\";s:0:\"\";s:3:\"sub\";s:0:\"\";s:5:\"subsl\";s:0:\"\";s:8:\"subhight\";s:0:\"\";s:8:\"submoshi\";s:0:\"\";s:8:\"subcolor\";s:0:\"\";s:8:\"searchbl\";s:0:\"\";s:6:\"navlib\";s:0:\"\";s:9:\"navheight\";s:2:\"92\";s:6:\"shadow\";s:0:\"\";s:5:\"sicon\";s:0:\"\";s:9:\"navliyjan\";s:0:\"\";s:3:\"mbl\";s:0:\"\";}}"],"_droptcolor":["#ffffff"],"_rightbtn":["a:1:{i:0;a:8:{s:4:\"text\";s:0:\"\";s:3:\"url\";s:0:\"\";s:5:\"color\";s:0:\"\";s:4:\"type\";s:0:\"\";s:5:\"hover\";s:7:\"#ffffff\";s:6:\"radius\";s:0:\"\";s:6:\"color2\";s:62:\"linear-gradient(135deg,rgb(6,147,227) 8%,rgb(155,81,224) 100%)\";s:5:\"zixun\";s:0:\"\";}}"],"catce":["sidebar-widgets4"]},"medium_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover-300x300.jpg","thumbnail_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover-150x150.jpg","full_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover.jpg","_links":{"self":[{"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/posts\/7886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/comments?post=7886"}],"version-history":[{"count":0,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/posts\/7886\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/media\/7876"}],"wp:attachment":[{"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/media?parent=7886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/categories?post=7886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/fr\/wp-json\/wp\/v2\/tags?post=7886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}