{"id":7886,"date":"2026-11-21T08:49:10","date_gmt":"2026-11-21T00:49:10","guid":{"rendered":"https:\/\/www.jiujuauto.com\/?p=7886"},"modified":"2026-11-23T09:33:44","modified_gmt":"2026-11-23T01:33:44","slug":"%e5%96%87%e5%8f%ad%e8%a3%85%e9%85%8d%e7%ba%bf%e9%aa%8c%e6%94%b6%e8%a6%81%e7%9c%8b%e5%93%aa%e5%87%a0%e9%a1%b9%ef%bc%9f%e4%b9%85%e5%b7%a8%e7%bb%99%e7%9a%84%e6%a3%80%e6%9f%a5%e9%a1%ba%e5%ba%8f","status":"publish","type":"post","link":"https:\/\/www.jiujuauto.com\/en\/faq\/7886.html","title":{"rendered":"What should you check when accepting a loudspeaker assembly line? Jiuju's inspection order"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Acceptance is not ticking boxes; it is reproducing. If the line ran well while the supplier was there and will not run for you afterwards, the conditions were not recorded at acceptance. Order matters more than the list: static first, then dynamic, then the numbers.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component.jpg\" alt=\"Finished Jiuju loudspeaker magnetic circuit components\" class=\"wp-image-7839\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u7ec4\u4ef6\u6210\u54c1_JIUJU-Loudspeaker-Magnetic-Circuit-Component-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Start with static checks: what do you look at?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Datum, clearance, guarding. Whether datum faces show machining marks, whether locating parts can be swapped, whether clearances between moving and fixed parts are consistent. Guarding covers light curtains, emergency stops and door interlocks: they take no part in production, but they are the last line when something goes wrong.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Then dynamic: dry run, run with product, continuous run, what is the difference?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A dry run shows whether motions are smooth, with no interference or abnormal noise; a run with product shows whether locating, gripping and pressing are stable; a continuous run shows temperature rise, wear and cycle time drift. All three must be run; a dry run alone is not an acceptance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How should the numbers be recorded to count?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cycle time as the average of the whole batch, not the fastest single piece; yield as output over input, not good units divided by inspected units; downtime recorded by category, because if you cannot separate a fault from a material change or waiting for an operator, there is nothing to improve. Fix the definition of these three and later comparisons become possible.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B.jpg\" alt=\"Jiuju loudspeaker magnetic circuit assembly station\" class=\"wp-image-7865\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u78c1\u8def\u88c5\u914d\u5de5\u4f4d_JIUJU-Loudspeaker-Magnetic-Circuit-Assembly-Station-B-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Which documents should be handed over?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Drawings, parameter lists, spare parts lists, maintenance intervals. The parameter list is the one most often skipped: if the values in the PLC are not handed over, the next person cannot bring them back. The spare parts list should show lead times for critical items; for wear parts without spares, a stoppage means waiting for delivery.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What if acceptance fails?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Two categories: what can be corrected gets a corrective item, a deadline and a re-test; what cannot gets a concession acceptance with the scope of impact stated. Both must be on paper; a verbal agreement is the easiest thing to turn into a dispute after mass production starts. One step is often skipped: keep corrective and concession items in separate lists, close a corrective item only after re-test, and have the concession signed.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview.jpg\" alt=\"Panoramic view of the Jiuju loudspeaker automated assembly line workshop\" class=\"wp-image-7866\" srcset=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview.jpg 1200w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-300x225.jpg 300w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-1024x768.jpg 1024w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-768x576.jpg 768w, https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u8f66\u95f4\u5168\u666f_JIUJU-Loudspeaker-Assembly-Line-Workshop-Overview-16x12.jpg 16w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Which item is most often missed?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The method for judging the first piece. Most acceptances only check that the first piece passed, not what the judgement was based on. What the standard is, who judges, and where it is recorded: leave those three open and the same dispute returns after mass production. One dispute usually means stopping the line to renegotiate, which costs far more than half a day at acceptance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acceptance has to be done on the whole line, not machine by machine.<a href=\"https:\/\/www.jiujuauto.com\/en\/product-center\/automotive-speaker-automated-production-line\/4511.html\/\">Automotive Speaker Automation Production Line<\/a>Lines of this kind have the most interfaces: conveying height between stations, carrier handover and cycle time matching all have to be looked at together; the model-changeover capability of an<a href=\"https:\/\/www.jiujuauto.com\/en\/product-center\/automatic-audio-speaker-production-line\/4512.html\/\">Audio Speaker Automation Production Line<\/a>should be demonstrated by the supplier during acceptance; the stability of the magnetic circuit section depends on the<a href=\"https:\/\/www.jiujuauto.com\/en\/product-center\/speaker-magnetic-circuit-machine\/4508.html\/\">Speaker Internal-magnet Automatic Magnetic Circuit Machine<\/a>'s locating and pressing, and acceptance has to run enough pieces from one incoming lot to show that stability.<\/p>","protected":false},"excerpt":{"rendered":"<p>Acceptance is reproduction, not box-ticking: static checks of datum and guarding, then dry runs, runs with product and continuous runs, and finally fixed data definitions and document handover. The item most often missed is how the first piece is judged.<\/p>","protected":false},"author":1,"featured_media":7876,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f","_seopress_titles_desc":"\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536","_monsterinsights_skip_tracking":false,"themepark_post_bcolor":"#f5f5f5","themepark_post_width":"1022px","themepark_post_img":"","themepark_post_img_po":"left","themepark_post_img_re":false,"themepark_post_img_cover":false,"themepark_post_img_fixed":false,"themepark_post_hide_title":false,"themepark_post_main_b":"","themepark_post_main_p":100,"themepark_paddingblock":false,"_geo_short_summary":"\u9a8c\u6536\u987a\u5e8f\u662f\u9759\u6001\u3001\u52a8\u6001\u3001\u6570\u636e\u3001\u6587\u4ef6\uff1a\u5148\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u8dd1\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed\u4e09\u6bb5\uff0c\u6700\u540e\u7edf\u4e00\u8282\u62cd\u4e0e\u826f\u7387\u53e3\u5f84\u3002 Acceptance runs static, dynamic, data, then documents: check datums and guarding first, then no-load, loaded and continuous runs, and finally agree how cycle time and yield are counted.","_geo_structured_desc":"\u80cc\u666f\uff1a\u4ea7\u7ebf\u9a8c\u6536\u5e38\u505a\u6210\u6253\u52fe\uff0c\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u8fd0\u884c\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u590d\u73b0\u4e0d\u51fa\u6765\uff0c\u539f\u56e0\u662f\u9a8c\u6536\u65f6\u6ca1\u8bb0\u5f55\u6761\u4ef6\u4e0e\u5224\u5b9a\u65b9\u6cd5\u3002\n\n\u8981\u70b9\uff1a\u9759\u6001\u770b\u57fa\u51c6\u9762\u3001\u5b9a\u4f4d\u4ef6\u4e92\u6362\u6027\u3001\u8fd0\u52a8\u95f4\u9699\u4e0e\u5b89\u5168\u9632\u62a4\uff1b\u52a8\u6001\u5206\u4e09\u6bb5\u8dd1\u2014\u2014\u7a7a\u8dd1\u770b\u5e72\u6d89\u4e0e\u5f02\u54cd\uff0c\u5e26\u6599\u8dd1\u770b\u5b9a\u4f4d\u4e0e\u538b\u5408\uff0c\u8fde\u7eed\u8dd1\u770b\u6e29\u5347\u3001\u78e8\u635f\u4e0e\u8282\u62cd\u6f02\u79fb\u3002\u6570\u636e\u8981\u56fa\u5b9a\u53e3\u5f84\uff1a\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\u3001\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\u3001\u505c\u673a\u5206\u7c7b\u8bb0\u5f55\u3002\u6587\u4ef6\u6536\u56db\u4efd\uff1a\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u53c2\u6570\u8868\u4e0d\u4e0a\u4ea4\u4f1a\u5bfc\u81f4\u6362\u4eba\u8c03\u4e0d\u51fa\u3002\u9996\u4ef6\u786e\u8ba4\u8981\u6709\u5224\u5b9a\u6807\u51c6\u3001\u5224\u5b9a\u4eba\u548c\u8bb0\u5f55\u4f4d\u7f6e\u3002\n\n\u7ed3\u8bba\uff1a\u6574\u7ebf\u9a8c\u6536\u800c\u975e\u5355\u673a\u9a8c\u6536\uff0c\u6362\u578b\u80fd\u529b\u8981\u73b0\u573a\u6f14\u793a\uff0c\u7a33\u5b9a\u6027\u8981\u7528\u540c\u4e00\u6279\u6765\u6599\u8dd1\u591f\u6570\u91cf\u3002\n\nBackground: Line acceptance often turns into ticking boxes. The line runs fine while the supplier is on site, then cannot be reproduced after handover, because the conditions and the accept-or-reject method were never recorded.\n\nKey points: Static checks cover datum faces, interchangeability of locators, motion clearances and safety guarding. Dynamic checks run in three stages - no-load for interference and noise, loaded for location and pressing, continuous for temperature rise, wear and cycle-time drift. Data needs fixed definitions: cycle time as a batch average, yield as output over input, downtime logged by category. Four documents should be handed over: drawings, a parameter table, a spare-parts list and a maintenance schedule; without the parameter table, a new operator cannot set the line up. First-article approval needs a written criterion, a named approver and a place to record it.\n\nConclusion: Accept the whole line, not single machines. Changeover capability should be demonstrated on site, and stability proven with enough units from one incoming lot.\n","_geo_faqs":"[{\"question\":\"\u9a8c\u6536\u8981\u8dd1\u591a\u4e45\u624d\u7b97\u591f\uff1f \\\/ How long should acceptance testing run?\",\"answer\":\"\u6309\u6279\u91cf\u4e0e\u8282\u62cd\u5b9a\uff0c\u81f3\u5c11\u8986\u76d6\u4e00\u4e2a\u5b8c\u6574\u6279\u6b21\uff0c\u5e76\u5305\u542b\u4e00\u6b21\u6362\u578b\uff0c\u624d\u80fd\u770b\u51fa\u7a33\u5b9a\u6027\u3002 \\\/ Set it by batch size and cycle time, and cover at least one complete batch including a changeover, or stability will not show.\"},{\"question\":\"\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u4e0d\u6b63\u5e38\uff0c\u600e\u4e48\u529e\uff1f \\\/ Fine with the supplier present, not after handover - what then?\",\"answer\":\"\u8865\u8bb0\u5f55\u6761\u4ef6\uff1a\u53c2\u6570\u3001\u6765\u6599\u6279\u6b21\u3001\u73af\u5883\u4e0e\u64cd\u4f5c\u65b9\u5f0f\u3002\u9a8c\u6536\u65f6\u6ca1\u8bb0\uff0c\u4e8b\u540e\u53ea\u80fd\u91cd\u8bd5\u3002 \\\/ Record the conditions: parameters, incoming lot, environment and operating method. If they were not written down at acceptance, the only option is to run it again.\"},{\"question\":\"\u6570\u636e\u8981\u8bb0\u54ea\u4e9b\uff1f \\\/ Which data should be recorded?\",\"answer\":\"\u8282\u62cd\u3001\u826f\u7387\u3001\u505c\u673a\u65f6\u95f4\u4e0e\u539f\u56e0\u3002\u4e09\u9879\u53e3\u5f84\u56fa\u5b9a\uff0c\u624d\u80fd\u8de8\u6279\u6b21\u6bd4\u8f83\u3002 \\\/ Cycle time, yield, and downtime with its cause. Fixed definitions are what make batches comparable.\"},{\"question\":\"\u54ea\u4e9b\u6587\u4ef6\u5fc5\u987b\u62ff\u5230\uff1f \\\/ Which documents must be handed over?\",\"answer\":\"\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u7f3a\u53c2\u6570\u8868\u6700\u9ebb\u70e6\uff0c\u6362\u4eba\u8c03\u4e0d\u51fa\u3002 \\\/ Drawings, a parameter table, a spare-parts list and a maintenance schedule. A missing parameter table hurts most: a new operator cannot set the line up.\"}]","_geo_key_points":"[\"\u9a8c\u6536\u662f\u590d\u73b0\uff0c\u4e0d\u662f\u6253\u52fe \\\/ Acceptance means reproducing, not ticking boxes\",\"\u5148\u9759\u6001\uff1a\u57fa\u51c6\u3001\u95f4\u9699\u3001\u9632\u62a4 \\\/ Static first: datums, clearances, guarding\",\"\u52a8\u6001\u8981\u8dd1\u4e09\u6bb5\uff1a\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed \\\/ Three dynamic runs: no-load, loaded, continuous\",\"\u53ea\u8dd1\u7a7a\u8dd1\u7b49\u4e8e\u6ca1\u9a8c \\\/ A no-load run alone proves nothing\",\"\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\uff0c\u4e0d\u6309\u5355\u4ef6\u6700\u5feb \\\/ Cycle time is a batch average, not the fastest unit\",\"\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\uff0c\u4e0d\u6309\u62bd\u68c0\u5408\u683c\u7387 \\\/ Yield is output over input, not sample pass rate\",\"\u505c\u673a\u8981\u5206\u7c7b\uff0c\u5426\u5219\u6539\u5584\u65e0\u4ece\u4e0b\u624b \\\/ Classify downtime or improvement has no target\",\"\u53c2\u6570\u8868\u4e0e\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u6700\u6613\u6f0f \\\/ Parameter tables and first-article criteria get missed\"]","_geo_target_audience":"\u5587\u53ed\u5236\u9020\u4f01\u4e1a\u7684\u8bbe\u5907\u7ba1\u7406\u3001\u751f\u4ea7\u6280\u672f\u4e0e\u91c7\u8d2d\u9a8c\u6536\u8d1f\u8d23\u4eba \/ Equipment managers, production technology leads and purchase acceptance owners at loudspeaker manufacturers","_geo_content_type":"","_geo_last_modified":"2026-11-20T19:30:22+08:00","_geo_version":1,"themepark_seo_title":"\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f\/Accepting a Speaker Assembly Line: The Check Order","themepark_seo_description":"\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002 Line acceptance is about reproducing results, not ticking boxes: static checks on datums and guarding, three dynamic runs, fixed data definitions and four documents. First-article criteria are what usually goes missing.","footnotes":""},"categories":[98],"tags":[682,182,681,683],"class_list":["post-7886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq","tag-682","tag-182","tag-681","tag-683"],"metadata":{"_thumbnail_id":["7876"],"_seopress_titles_title":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f"],"_seopress_titles_desc":["\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002"],"_seopress_analysis_target_kw":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536"],"_geo_short_summary":["\u9a8c\u6536\u987a\u5e8f\u662f\u9759\u6001\u3001\u52a8\u6001\u3001\u6570\u636e\u3001\u6587\u4ef6\uff1a\u5148\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u8dd1\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed\u4e09\u6bb5\uff0c\u6700\u540e\u7edf\u4e00\u8282\u62cd\u4e0e\u826f\u7387\u53e3\u5f84\u3002 Acceptance runs static, dynamic, data, then documents: check datums and guarding first, then no-load, loaded and continuous runs, and finally agree how cycle time and yield are counted."],"_geo_structured_desc":["\u80cc\u666f\uff1a\u4ea7\u7ebf\u9a8c\u6536\u5e38\u505a\u6210\u6253\u52fe\uff0c\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u8fd0\u884c\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u590d\u73b0\u4e0d\u51fa\u6765\uff0c\u539f\u56e0\u662f\u9a8c\u6536\u65f6\u6ca1\u8bb0\u5f55\u6761\u4ef6\u4e0e\u5224\u5b9a\u65b9\u6cd5\u3002\n\n\u8981\u70b9\uff1a\u9759\u6001\u770b\u57fa\u51c6\u9762\u3001\u5b9a\u4f4d\u4ef6\u4e92\u6362\u6027\u3001\u8fd0\u52a8\u95f4\u9699\u4e0e\u5b89\u5168\u9632\u62a4\uff1b\u52a8\u6001\u5206\u4e09\u6bb5\u8dd1\u2014\u2014\u7a7a\u8dd1\u770b\u5e72\u6d89\u4e0e\u5f02\u54cd\uff0c\u5e26\u6599\u8dd1\u770b\u5b9a\u4f4d\u4e0e\u538b\u5408\uff0c\u8fde\u7eed\u8dd1\u770b\u6e29\u5347\u3001\u78e8\u635f\u4e0e\u8282\u62cd\u6f02\u79fb\u3002\u6570\u636e\u8981\u56fa\u5b9a\u53e3\u5f84\uff1a\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\u3001\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\u3001\u505c\u673a\u5206\u7c7b\u8bb0\u5f55\u3002\u6587\u4ef6\u6536\u56db\u4efd\uff1a\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u53c2\u6570\u8868\u4e0d\u4e0a\u4ea4\u4f1a\u5bfc\u81f4\u6362\u4eba\u8c03\u4e0d\u51fa\u3002\u9996\u4ef6\u786e\u8ba4\u8981\u6709\u5224\u5b9a\u6807\u51c6\u3001\u5224\u5b9a\u4eba\u548c\u8bb0\u5f55\u4f4d\u7f6e\u3002\n\n\u7ed3\u8bba\uff1a\u6574\u7ebf\u9a8c\u6536\u800c\u975e\u5355\u673a\u9a8c\u6536\uff0c\u6362\u578b\u80fd\u529b\u8981\u73b0\u573a\u6f14\u793a\uff0c\u7a33\u5b9a\u6027\u8981\u7528\u540c\u4e00\u6279\u6765\u6599\u8dd1\u591f\u6570\u91cf\u3002\n\nBackground: Line acceptance often turns into ticking boxes. The line runs fine while the supplier is on site, then cannot be reproduced after handover, because the conditions and the accept-or-reject method were never recorded.\n\nKey points: Static checks cover datum faces, interchangeability of locators, motion clearances and safety guarding. Dynamic checks run in three stages - no-load for interference and noise, loaded for location and pressing, continuous for temperature rise, wear and cycle-time drift. Data needs fixed definitions: cycle time as a batch average, yield as output over input, downtime logged by category. Four documents should be handed over: drawings, a parameter table, a spare-parts list and a maintenance schedule; without the parameter table, a new operator cannot set the line up. First-article approval needs a written criterion, a named approver and a place to record it.\n\nConclusion: Accept the whole line, not single machines. Changeover capability should be demonstrated on site, and stability proven with enough units from one incoming lot.\n"],"_geo_faqs":["[{\"question\":\"\u9a8c\u6536\u8981\u8dd1\u591a\u4e45\u624d\u7b97\u591f\uff1f \\\/ How long should acceptance testing run?\",\"answer\":\"\u6309\u6279\u91cf\u4e0e\u8282\u62cd\u5b9a\uff0c\u81f3\u5c11\u8986\u76d6\u4e00\u4e2a\u5b8c\u6574\u6279\u6b21\uff0c\u5e76\u5305\u542b\u4e00\u6b21\u6362\u578b\uff0c\u624d\u80fd\u770b\u51fa\u7a33\u5b9a\u6027\u3002 \\\/ Set it by batch size and cycle time, and cover at least one complete batch including a changeover, or stability will not show.\"},{\"question\":\"\u4f9b\u5e94\u5546\u5728\u573a\u65f6\u6b63\u5e38\uff0c\u63a5\u624b\u540e\u4e0d\u6b63\u5e38\uff0c\u600e\u4e48\u529e\uff1f \\\/ Fine with the supplier present, not after handover - what then?\",\"answer\":\"\u8865\u8bb0\u5f55\u6761\u4ef6\uff1a\u53c2\u6570\u3001\u6765\u6599\u6279\u6b21\u3001\u73af\u5883\u4e0e\u64cd\u4f5c\u65b9\u5f0f\u3002\u9a8c\u6536\u65f6\u6ca1\u8bb0\uff0c\u4e8b\u540e\u53ea\u80fd\u91cd\u8bd5\u3002 \\\/ Record the conditions: parameters, incoming lot, environment and operating method. If they were not written down at acceptance, the only option is to run it again.\"},{\"question\":\"\u6570\u636e\u8981\u8bb0\u54ea\u4e9b\uff1f \\\/ Which data should be recorded?\",\"answer\":\"\u8282\u62cd\u3001\u826f\u7387\u3001\u505c\u673a\u65f6\u95f4\u4e0e\u539f\u56e0\u3002\u4e09\u9879\u53e3\u5f84\u56fa\u5b9a\uff0c\u624d\u80fd\u8de8\u6279\u6b21\u6bd4\u8f83\u3002 \\\/ Cycle time, yield, and downtime with its cause. Fixed definitions are what make batches comparable.\"},{\"question\":\"\u54ea\u4e9b\u6587\u4ef6\u5fc5\u987b\u62ff\u5230\uff1f \\\/ Which documents must be handed over?\",\"answer\":\"\u56fe\u7eb8\u3001\u53c2\u6570\u8868\u3001\u5907\u4ef6\u6e05\u5355\u3001\u7ef4\u62a4\u5468\u671f\uff0c\u7f3a\u53c2\u6570\u8868\u6700\u9ebb\u70e6\uff0c\u6362\u4eba\u8c03\u4e0d\u51fa\u3002 \\\/ Drawings, a parameter table, a spare-parts list and a maintenance schedule. A missing parameter table hurts most: a new operator cannot set the line up.\"}]"],"_geo_key_points":["[\"\u9a8c\u6536\u662f\u590d\u73b0\uff0c\u4e0d\u662f\u6253\u52fe \\\/ Acceptance means reproducing, not ticking boxes\",\"\u5148\u9759\u6001\uff1a\u57fa\u51c6\u3001\u95f4\u9699\u3001\u9632\u62a4 \\\/ Static first: datums, clearances, guarding\",\"\u52a8\u6001\u8981\u8dd1\u4e09\u6bb5\uff1a\u7a7a\u8dd1\u3001\u5e26\u6599\u3001\u8fde\u7eed \\\/ Three dynamic runs: no-load, loaded, continuous\",\"\u53ea\u8dd1\u7a7a\u8dd1\u7b49\u4e8e\u6ca1\u9a8c \\\/ A no-load run alone proves nothing\",\"\u8282\u62cd\u6309\u6574\u6279\u5e73\u5747\uff0c\u4e0d\u6309\u5355\u4ef6\u6700\u5feb \\\/ Cycle time is a batch average, not the fastest unit\",\"\u826f\u7387\u6309\u6295\u5165\u4ea7\u51fa\uff0c\u4e0d\u6309\u62bd\u68c0\u5408\u683c\u7387 \\\/ Yield is output over input, not sample pass rate\",\"\u505c\u673a\u8981\u5206\u7c7b\uff0c\u5426\u5219\u6539\u5584\u65e0\u4ece\u4e0b\u624b \\\/ Classify downtime or improvement has no target\",\"\u53c2\u6570\u8868\u4e0e\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u6700\u6613\u6f0f \\\/ Parameter tables and first-article criteria get missed\"]"],"_geo_target_audience":["\u5587\u53ed\u5236\u9020\u4f01\u4e1a\u7684\u8bbe\u5907\u7ba1\u7406\u3001\u751f\u4ea7\u6280\u672f\u4e0e\u91c7\u8d2d\u9a8c\u6536\u8d1f\u8d23\u4eba \/ Equipment managers, production technology leads and purchase acceptance owners at loudspeaker manufacturers"],"_geo_last_modified":["2026-11-20T19:30:22+08:00"],"_geo_version":["1"],"themepark_seo_title":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u8981\u770b\u54ea\u51e0\u9879\uff1f\u4e45\u5de8\u7ed9\u7684\u68c0\u67e5\u987a\u5e8f\/Accepting a Speaker Assembly Line: The Check Order"],"themepark_seo_description":["\u9a8c\u6536\u662f\u590d\u73b0\u4e0d\u662f\u6253\u52fe\uff1a\u5148\u9759\u6001\u770b\u57fa\u51c6\u4e0e\u9632\u62a4\uff0c\u518d\u52a8\u6001\u7a7a\u8dd1\u5e26\u6599\u8dd1\u8fde\u7eed\u8dd1\uff0c\u6700\u540e\u56fa\u5b9a\u6570\u636e\u53e3\u5f84\u4e0e\u6587\u4ef6\u4ea4\u4ed8\u3002\u6700\u6613\u6f0f\u7684\u662f\u9996\u4ef6\u5224\u5b9a\u65b9\u6cd5\u3002 Line acceptance is about reproducing results, not ticking boxes: static checks on datums and guarding, three dynamic runs, fixed data definitions and four documents. First-article criteria are what usually goes missing."],"_edit_last":["1"],"themepark_seo_keyword":["\u5587\u53ed\u88c5\u914d\u7ebf\u9a8c\u6536\u3001\u4ea7\u7ebf\u9a8c\u6536\u6807\u51c6\u3001\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u3001\u8bbe\u5907\u9a8c\u6536"],"_edit_lock":["1795395381:1"],"views":["119"],"_headinfo":["a:1:{i:0;a:27:{s:6:\"module\";s:1:\"1\";s:7:\"navtext\";i:14;s:4:\"navb\";b:0;s:5:\"navpd\";i:15;s:5:\"navc1\";s:0:\"\";s:5:\"navc2\";s:7:\"#ffffff\";s:5:\"navc3\";s:7:\"#000000\";s:5:\"navc4\";s:0:\"\";s:5:\"navc5\";s:7:\"#000000\";s:5:\"navc6\";i:100;s:5:\"topc1\";s:0:\"\";s:5:\"topc2\";s:0:\"\";s:4:\"topf\";s:0:\"\";s:6:\"seach1\";s:0:\"\";s:6:\"seach2\";s:0:\"\";s:3:\"sub\";s:0:\"\";s:5:\"subsl\";s:0:\"\";s:8:\"subhight\";s:0:\"\";s:8:\"submoshi\";s:0:\"\";s:8:\"subcolor\";s:0:\"\";s:8:\"searchbl\";s:0:\"\";s:6:\"navlib\";s:0:\"\";s:9:\"navheight\";s:2:\"92\";s:6:\"shadow\";s:0:\"\";s:5:\"sicon\";s:0:\"\";s:9:\"navliyjan\";s:0:\"\";s:3:\"mbl\";s:0:\"\";}}"],"_droptcolor":["#ffffff"],"_rightbtn":["a:1:{i:0;a:8:{s:4:\"text\";s:0:\"\";s:3:\"url\";s:0:\"\";s:5:\"color\";s:0:\"\";s:4:\"type\";s:0:\"\";s:5:\"hover\";s:7:\"#ffffff\";s:6:\"radius\";s:0:\"\";s:6:\"color2\";s:62:\"linear-gradient(135deg,rgb(6,147,227) 8%,rgb(155,81,224) 100%)\";s:5:\"zixun\";s:0:\"\";}}"],"catce":["sidebar-widgets4"]},"medium_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover-300x300.jpg","thumbnail_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover-150x150.jpg","full_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u4e45\u5de8\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u9a8c\u6536\u5c01\u9762_JIUJU-Loudspeaker-Assembly-Line-Acceptance-Cover.jpg","_links":{"self":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts\/7886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/comments?post=7886"}],"version-history":[{"count":0,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts\/7886\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/media\/7876"}],"wp:attachment":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/media?parent=7886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/categories?post=7886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/tags?post=7886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}