{"id":7824,"date":"2026-11-16T19:36:21","date_gmt":"2026-11-16T11:36:21","guid":{"rendered":"https:\/\/www.jiujuauto.com\/?p=7824"},"modified":"2026-11-16T19:36:26","modified_gmt":"2026-11-16T11:36:26","slug":"%e6%89%ac%e5%a3%b0%e5%99%a8%e8%a3%85%e9%85%8d%e7%ba%bf%e8%a3%85%e8%bf%90%e7%8e%b0%e5%9c%ba%ef%bc%9a%e5%8c%85%e8%a6%86%e3%80%81%e5%90%8a%e8%a3%85%e4%b8%8e%e8%a3%85%e8%bd%a6","status":"publish","type":"post","link":"https:\/\/www.jiujuauto.com\/en\/news\/company-news\/7824.html","title":{"rendered":"Speaker assembly line shipment site: wrapping, lifting and loading"},"content":{"rendered":"<h2 class=\"wp-block-heading\">From the dispatch area to the tail of the truck: a record of the loading stage<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">November 2026, about 25 seconds of on-site footage: a large<a href=\"https:\/\/www.jiujuauto.com\/en\/category\/product-center\/\">Speaker automated assembly line<\/a>is wrapped, lifted and loaded at the plant. The camera follows from the dispatch area in the workshop to the back of the truck, recording the loading stage itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the loading yard the crane stands beside a flatbed. The jib lifts an already wrapped module from the dispatch area and swings it over the truck bed; a forklift at the side adjusts the angle, and once the module is set down it is checked by hand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Inside the workshop rows of modules are already wrapped in stretch film, with corner protectors added at the edges. Wrapping is a fixed step before dispatch: it keeps out dust and moisture and reduces scuffing in transit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Modules are arranged by size and centre of gravity; once on the truck they are strapped section by section to limit movement, and flatbed and container are used in sequence. Split points follow station boundaries and match the<a href=\"https:\/\/www.jiujuauto.com\/en\/product-center\/automotive-speaker-automated-production-line\/4511.html\/\">Automotive Speaker Automation Production Line<\/a>station sequence, so the line is put back together in the same order on site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before loading, several people on site check each module against its truck position and confirm the order; the lift is directed by one person in charge.<\/p>\n\n\n\n<section class=\"wp-block-themepark-block-themepark-area block_layout thempark-block undefined\" id=\"\" style=\"\" data-swiper-parallax=\"-700\"><div class=\"block_layout_in\" style=\"max-width:317px;\">\n<div class=\"wp-block-column block_layout_in is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-video aligncenter\"><video height=\"1080\" style=\"aspect-ratio: 607 \/ 1080;\" width=\"607\" controls src=\"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/pasted-image-20261116-113012-375.mp4\"><\/video><\/figure>\n<\/div>\n<\/div><div class=\"layout_badh\"><\/div><\/section>\n\n\n\n<p class=\"wp-block-paragraph\">This page covers the shipping stage only; equipment model, capacity and lead time are not included. For similar equipment,<a href=\"https:\/\/www.jiujuauto.com\/en\/category\/case\/\">delivery cases<\/a>and configurations are confirmed by our sales team.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\">Related<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.jiujuauto.com\/en\/category\/product-center\/\">Loudspeaker assembly line \u2014 section overview<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.jiujuauto.com\/en\/product-center\/automotive-speaker-automated-production-line\/4511.html\/\">Automotive speaker automated production line \u2014 details<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.jiujuauto.com\/en\/news\/company-news\/7812.html\/\">Delivery record for this assembly line<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><em>To ask about shipping and delivery, call 400-626-8699, or<a href=\"https:\/\/www.jiujuauto.com\/en\/contact.html\/\"><strong>book a visit to our Shenzhen or Dongguan plant<\/strong><\/a>and see the assembly line running on site. Jiuju has specialised in loudspeaker assembly equipment for 16 years.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>In November 2026, a large speaker assembly line was wrapped, lifted and loaded at the Jiuju plant, with the camera following from the dispatch area to the truck tail. (About 25 seconds of on-site footage.)<\/p>","protected":false},"author":1,"featured_media":7837,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"\u626c\u58f0\u5668\u88c5\u914d\u7ebf\u88c5\u8fd0\u73b0\u573a\uff1a\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66","_seopress_titles_desc":"2026 \u5e74 11 \u6708\uff0c\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u5728\u4e45\u5de8\u5382\u533a\u5b8c\u6210\u7f20\u7ed5\u819c\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u3002\u955c\u5934\u4ece\u8f66\u95f4\u5f85\u53d1\u533a\u8ddf\u5230\u5361\u8f66\u5c3e\u90e8\uff0c\u8bb0\u5f55\u7684\u662f\u88c5\u8fd0\u73af\u8282\u672c\u8eab\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf","_monsterinsights_skip_tracking":false,"themepark_post_bcolor":"#f5f5f5","themepark_post_width":"1022px","themepark_post_img":"","themepark_post_img_po":"left","themepark_post_img_re":false,"themepark_post_img_cover":false,"themepark_post_img_fixed":false,"themepark_post_hide_title":false,"themepark_post_main_b":"","themepark_post_main_p":100,"themepark_paddingblock":false,"_geo_short_summary":"2026 \u5e74 11 \u6708\uff0c\u4e45\u5de8\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u6309\u5de5\u4f4d\u62c6\u6210\u6a21\u5757\uff0c\u7f20\u7ed5\u819c\u5305\u8986\u540e\u540a\u88c5\u88c5\u8f66\u53d1\u8fd0\u3002 In November 2026, a large speaker assembly line from Jiuju was split into modules at station boundaries, wrapped in stretch film and loaded for shipment.","_geo_structured_desc":"\u80cc\u666f\uff1a\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u6574\u673a\u4f53\u79ef\u5927\uff0c\u65e0\u6cd5\u6574\u4f53\u8fd0\u8f93\uff0c\u9700\u6309\u5de5\u4f4d\u62c6\u6210\u6a21\u5757\u540e\u5206\u6279\u4ea4\u4ed8\u3002\n\n\u8981\u70b9\uff1a\u62c6\u5206\u4f4d\u7f6e\u6309\u5de5\u4f4d\u8fb9\u754c\u786e\u5b9a\uff0c\u4e0e\u88c5\u914d\u5de5\u5e8f\u987a\u5e8f\u4e00\u4e00\u5bf9\u5e94\uff1b\u6a21\u5757\u7528\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u3001\u68f1\u89d2\u52a0\u62a4\u89d2\uff0c\u9632\u5c18\u9632\u6f6e\u5e76\u51cf\u5c11\u522e\u64e6\u3002\u540a\u88c5\u7531\u8d77\u91cd\u673a\u4e0e\u53c9\u8f66\u914d\u5408\u5b8c\u6210\uff0c\u843d\u4f4d\u540e\u4eba\u5de5\u6821\u51c6\uff1b\u88c5\u8f66\u6309\u6a21\u5757\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03\uff0c\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u4ee5\u51cf\u5c11\u9014\u4e2d\u4f4d\u79fb\uff0c\u5e73\u677f\u8f66\u4e0e\u96c6\u88c5\u7bb1\u4e24\u79cd\u8f7d\u4f53\u63a5\u7eed\u88c5\u8fd0\u3002\u88c5\u8f66\u524d\u591a\u540d\u5de5\u4f5c\u4eba\u5458\u5bf9\u7167\u6a21\u5757\u4e0e\u8f66\u4f4d\u786e\u8ba4\u5148\u540e\u987a\u5e8f\uff0c\u540a\u88c5\u7531\u8d1f\u8d23\u4eba\u7edf\u4e00\u6307\u6325\u3002\n\n\u7ed3\u8bba\uff1a\u6a21\u5757\u5230\u573a\u540e\u6309\u5de5\u4f4d\u987a\u5e8f\u590d\u4f4d\u3002\u672c\u9875\u53ea\u8bb0\u5f55\u88c5\u8fd0\u73af\u8282\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002\n\nBackground: A complete speaker assembly line is too large to ship in one piece, so it is split into modules at station boundaries and delivered in batches.\n\nKey points: Split points follow station boundaries and match the assembly sequence one to one. Each module is wrapped end to end in stretch film with corner protectors, keeping out dust and moisture and reducing scuffing. Lifting is done by crane with forklift support, and modules are aligned by hand once lowered. Loading follows module size and centre of gravity; lashing is tensioned section by section to limit movement in transit, and flatbed trailers and containers are used in sequence. Before loading, several staff members check modules against slot order, and one person directs the lift throughout.\n\nConclusion: Modules are re-assembled in station order on arrival. This page records the loading stage only and does not cover equipment models, capacity or lead times.\n","_geo_faqs":"[{\"question\":\"\u88c5\u914d\u7ebf\u4e3a\u4ec0\u4e48\u8981\u62c6\u5f00\u8fd0\u8f93\uff1f \\\/ Why is the line shipped in parts?\",\"answer\":\"\u6574\u673a\u4f53\u79ef\u4e0e\u957f\u5ea6\u8d85\u51fa\u5e38\u89c4\u8fd0\u8f93\u6761\u4ef6\uff0c\u6309\u5de5\u4f4d\u8fb9\u754c\u62c6\u6210\u6a21\u5757\u540e\u5206\u6279\u88c5\u8f66\uff0c\u5230\u573a\u518d\u6309\u987a\u5e8f\u590d\u4f4d\u3002 \\\/ A complete line is too large for normal transport, so it is split at station boundaries, loaded in batches and re-assembled on arrival.\"},{\"question\":\"\u62c6\u5206\u4f4d\u7f6e\u6309\u4ec0\u4e48\u6807\u51c6\u786e\u5b9a\uff1f \\\/ How are the split points chosen?\",\"answer\":\"\u6309\u5de5\u4f4d\u8fb9\u754c\uff0c\u4e0e\u88c5\u914d\u5de5\u5e8f\u987a\u5e8f\u4e00\u4e00\u5bf9\u5e94\uff1b\u6bb5\u95f4\u8fde\u7ebf\u4e0e\u6c14\u8def\u7559\u51fa\u4f59\u91cf\uff0c\u4fbf\u4e8e\u5230\u573a\u5bf9\u63a5\u3002 \\\/ At station boundaries, matching the assembly sequence; cables and air lines are left with slack for on-site reconnection.\"},{\"question\":\"\u8fd0\u8f93\u9014\u4e2d\u600e\u4e48\u9632\u6b62\u6a21\u5757\u4f4d\u79fb\uff1f \\\/ How are modules kept from shifting?\",\"answer\":\"\u6a21\u5757\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u3001\u68f1\u89d2\u52a0\u62a4\u89d2\uff1b\u88c5\u8f66\u6309\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03\uff0c\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u3002 \\\/ Stretch-wrapped with corner protectors; loading follows size and centre of gravity, lashing tensioned section by section.\"},{\"question\":\"\u89c6\u9891\u53ea\u6709 25 \u79d2\uff0c\u662f\u5b8c\u6574\u6d41\u7a0b\u5417\uff1f \\\/ Is the 25-second clip the full process?\",\"answer\":\"\u672c\u7247\u8bb0\u5f55\u7684\u662f\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u8fd9\u4e00\u6bb5\uff0c\u4e0d\u542b\u8bbe\u5907\u8c03\u8bd5\u4e0e\u5230\u573a\u590d\u88c5\u3002 \\\/ It covers wrapping, lifting and loading only, not commissioning or on-site re-assembly.\"},{\"question\":\"\u5982\u4f55\u8054\u7cfb\u4e45\u5de8\u4e86\u89e3\u88c5\u914d\u7ebf\u4ea4\u4ed8\uff1f \\\/ How can I ask about line delivery?\",\"answer\":\"\u53ef\u62e8\u6253 400-626-8699\uff0c\u6216\u53d1\u90ae\u4ef6\u81f3 zx@szjiuju.com\u3002 \\\/ Call +86 134-2897-6919 or email zx@szjiuju.com.\"}]","_geo_key_points":"[\"\u6309\u5de5\u4f4d\u8fb9\u754c\u62c6\u6210\u6a21\u5757 \\\/ Split at station boundaries\",\"\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u52a0\u62a4\u89d2 \\\/ Stretch-wrapped, corner protectors\",\"\u540a\u88c5\u7531\u8d1f\u8d23\u4eba\u7edf\u4e00\u6307\u6325 \\\/ One person directs the lift\",\"\u88c5\u8f66\u6309\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03 \\\/ Loaded by size and centre of gravity\",\"\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u9632\u4f4d\u79fb \\\/ Lashed section by section\",\"\u5e73\u677f\u8f66\u4e0e\u96c6\u88c5\u7bb1\u63a5\u7eed\u88c5\u8fd0 \\\/ Flatbed and container in sequence\",\"\u5230\u573a\u6309\u5de5\u4f4d\u987a\u5e8f\u590d\u4f4d \\\/ Re-assembled in station order\",\"\u753b\u9762\u4e3a 25 \u79d2\u73b0\u573a\u8bb0\u5f55 \\\/ 25-second on-site record\"]","_geo_target_audience":"\u5587\u53ed\u4e0e\u626c\u58f0\u5668\u5236\u9020\u4f01\u4e1a\u7684\u4ea7\u7ebf\u89c4\u5212\u3001\u5de5\u827a\u5de5\u7a0b\u5e08\u53ca\u8bbe\u5907\u91c7\u8d2d\u8d1f\u8d23\u4eba \/ Production planners, process engineers and equipment buyers at loudspeaker manufacturers","_geo_content_type":"","_geo_last_modified":"2026-11-17T08:30:04+08:00","_geo_version":1,"themepark_seo_title":"\u626c\u58f0\u5668\u88c5\u914d\u7ebf\u88c5\u8fd0\u73b0\u573a\uff1a\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\/Speaker Assembly Line Loading: Wrapping, Lifting, Securing","themepark_seo_description":"2026 \u5e74 11 \u6708\uff0c\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u5728\u4e45\u5de8\u5382\u533a\u5b8c\u6210\u7f20\u7ed5\u819c\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u3002\u955c\u5934\u4ece\u8f66\u95f4\u5f85\u53d1\u533a\u8ddf\u5230\u5361\u8f66\u5c3e\u90e8\uff0c\u8bb0\u5f55\u7684\u662f\u88c5\u8fd0\u73af\u8282\u672c\u8eab\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002 In November 2026, a large speaker assembly line from Jiuju was wrapped, lifted and loaded for shipment. Loading stage only, no lead times.","footnotes":""},"categories":[1],"tags":[323,182,680,676],"class_list":["post-7824","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-323","tag-182","tag-680","tag-676"],"metadata":{"themepark_seo_title":["\u626c\u58f0\u5668\u88c5\u914d\u7ebf\u88c5\u8fd0\u73b0\u573a\uff1a\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\/Speaker Assembly Line Loading: Wrapping, Lifting, Securing"],"themepark_seo_description":["2026 \u5e74 11 \u6708\uff0c\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u5728\u4e45\u5de8\u5382\u533a\u5b8c\u6210\u7f20\u7ed5\u819c\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u3002\u955c\u5934\u4ece\u8f66\u95f4\u5f85\u53d1\u533a\u8ddf\u5230\u5361\u8f66\u5c3e\u90e8\uff0c\u8bb0\u5f55\u7684\u662f\u88c5\u8fd0\u73af\u8282\u672c\u8eab\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002 In November 2026, a large speaker assembly line from Jiuju was wrapped, lifted and loaded for shipment. Loading stage only, no lead times."],"themepark_seo_keyword":["\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u3001\u5587\u53ed\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u3001\u626c\u58f0\u5668\u88c5\u914d\u7ebf\u88c5\u8fd0\u3001\u8bbe\u5907\u88c5\u8f66\u53d1\u8fd0"],"_seopress_titles_title":["\u626c\u58f0\u5668\u88c5\u914d\u7ebf\u88c5\u8fd0\u73b0\u573a\uff1a\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66"],"_seopress_titles_desc":["2026 \u5e74 11 \u6708\uff0c\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u5728\u4e45\u5de8\u5382\u533a\u5b8c\u6210\u7f20\u7ed5\u819c\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u3002\u955c\u5934\u4ece\u8f66\u95f4\u5f85\u53d1\u533a\u8ddf\u5230\u5361\u8f66\u5c3e\u90e8\uff0c\u8bb0\u5f55\u7684\u662f\u88c5\u8fd0\u73af\u8282\u672c\u8eab\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002"],"_seopress_analysis_target_kw":["\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf"],"_edit_lock":["1795242293:1"],"_edit_last":["1"],"catce":["sidebar-widgets4"],"views":["333"],"_headinfo":["a:1:{i:0;a:27:{s:6:\"module\";s:1:\"1\";s:7:\"navtext\";i:14;s:4:\"navb\";b:0;s:5:\"navpd\";i:15;s:5:\"navc1\";s:0:\"\";s:5:\"navc2\";s:7:\"#ffffff\";s:5:\"navc3\";s:7:\"#000000\";s:5:\"navc4\";s:0:\"\";s:5:\"navc5\";s:7:\"#000000\";s:5:\"navc6\";i:100;s:5:\"topc1\";s:0:\"\";s:5:\"topc2\";s:0:\"\";s:4:\"topf\";s:0:\"\";s:6:\"seach1\";s:0:\"\";s:6:\"seach2\";s:0:\"\";s:3:\"sub\";s:0:\"\";s:5:\"subsl\";s:0:\"\";s:8:\"subhight\";s:0:\"\";s:8:\"submoshi\";s:0:\"\";s:8:\"subcolor\";s:0:\"\";s:8:\"searchbl\";s:0:\"\";s:6:\"navlib\";s:0:\"\";s:9:\"navheight\";s:2:\"92\";s:6:\"shadow\";s:0:\"\";s:5:\"sicon\";s:0:\"\";s:9:\"navliyjan\";s:0:\"\";s:3:\"mbl\";s:0:\"\";}}"],"_droptcolor":["#ffffff"],"_rightbtn":["a:1:{i:0;a:8:{s:4:\"text\";s:0:\"\";s:3:\"url\";s:0:\"\";s:5:\"color\";s:0:\"\";s:4:\"type\";s:0:\"\";s:5:\"hover\";s:7:\"#ffffff\";s:6:\"radius\";s:0:\"\";s:6:\"color2\";s:62:\"linear-gradient(135deg,rgb(6,147,227) 8%,rgb(155,81,224) 100%)\";s:5:\"zixun\";s:0:\"\";}}"],"enclosure":["https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/pasted-image-20261116-113012-375.mp4\n10304877\nvideo\/mp4\n"],"_geo_short_summary":["2026 \u5e74 11 \u6708\uff0c\u4e45\u5de8\u4e00\u5957\u5927\u578b\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u6309\u5de5\u4f4d\u62c6\u6210\u6a21\u5757\uff0c\u7f20\u7ed5\u819c\u5305\u8986\u540e\u540a\u88c5\u88c5\u8f66\u53d1\u8fd0\u3002 In November 2026, a large speaker assembly line from Jiuju was split into modules at station boundaries, wrapped in stretch film and loaded for shipment."],"_geo_structured_desc":["\u80cc\u666f\uff1a\u626c\u58f0\u5668\u81ea\u52a8\u5316\u88c5\u914d\u7ebf\u6574\u673a\u4f53\u79ef\u5927\uff0c\u65e0\u6cd5\u6574\u4f53\u8fd0\u8f93\uff0c\u9700\u6309\u5de5\u4f4d\u62c6\u6210\u6a21\u5757\u540e\u5206\u6279\u4ea4\u4ed8\u3002\n\n\u8981\u70b9\uff1a\u62c6\u5206\u4f4d\u7f6e\u6309\u5de5\u4f4d\u8fb9\u754c\u786e\u5b9a\uff0c\u4e0e\u88c5\u914d\u5de5\u5e8f\u987a\u5e8f\u4e00\u4e00\u5bf9\u5e94\uff1b\u6a21\u5757\u7528\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u3001\u68f1\u89d2\u52a0\u62a4\u89d2\uff0c\u9632\u5c18\u9632\u6f6e\u5e76\u51cf\u5c11\u522e\u64e6\u3002\u540a\u88c5\u7531\u8d77\u91cd\u673a\u4e0e\u53c9\u8f66\u914d\u5408\u5b8c\u6210\uff0c\u843d\u4f4d\u540e\u4eba\u5de5\u6821\u51c6\uff1b\u88c5\u8f66\u6309\u6a21\u5757\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03\uff0c\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u4ee5\u51cf\u5c11\u9014\u4e2d\u4f4d\u79fb\uff0c\u5e73\u677f\u8f66\u4e0e\u96c6\u88c5\u7bb1\u4e24\u79cd\u8f7d\u4f53\u63a5\u7eed\u88c5\u8fd0\u3002\u88c5\u8f66\u524d\u591a\u540d\u5de5\u4f5c\u4eba\u5458\u5bf9\u7167\u6a21\u5757\u4e0e\u8f66\u4f4d\u786e\u8ba4\u5148\u540e\u987a\u5e8f\uff0c\u540a\u88c5\u7531\u8d1f\u8d23\u4eba\u7edf\u4e00\u6307\u6325\u3002\n\n\u7ed3\u8bba\uff1a\u6a21\u5757\u5230\u573a\u540e\u6309\u5de5\u4f4d\u987a\u5e8f\u590d\u4f4d\u3002\u672c\u9875\u53ea\u8bb0\u5f55\u88c5\u8fd0\u73af\u8282\uff0c\u4e0d\u542b\u8bbe\u5907\u578b\u53f7\u3001\u4ea7\u80fd\u4e0e\u4ea4\u671f\u3002\n\nBackground: A complete speaker assembly line is too large to ship in one piece, so it is split into modules at station boundaries and delivered in batches.\n\nKey points: Split points follow station boundaries and match the assembly sequence one to one. Each module is wrapped end to end in stretch film with corner protectors, keeping out dust and moisture and reducing scuffing. Lifting is done by crane with forklift support, and modules are aligned by hand once lowered. Loading follows module size and centre of gravity; lashing is tensioned section by section to limit movement in transit, and flatbed trailers and containers are used in sequence. Before loading, several staff members check modules against slot order, and one person directs the lift throughout.\n\nConclusion: Modules are re-assembled in station order on arrival. This page records the loading stage only and does not cover equipment models, capacity or lead times.\n"],"_geo_faqs":["[{\"question\":\"\u88c5\u914d\u7ebf\u4e3a\u4ec0\u4e48\u8981\u62c6\u5f00\u8fd0\u8f93\uff1f \\\/ Why is the line shipped in parts?\",\"answer\":\"\u6574\u673a\u4f53\u79ef\u4e0e\u957f\u5ea6\u8d85\u51fa\u5e38\u89c4\u8fd0\u8f93\u6761\u4ef6\uff0c\u6309\u5de5\u4f4d\u8fb9\u754c\u62c6\u6210\u6a21\u5757\u540e\u5206\u6279\u88c5\u8f66\uff0c\u5230\u573a\u518d\u6309\u987a\u5e8f\u590d\u4f4d\u3002 \\\/ A complete line is too large for normal transport, so it is split at station boundaries, loaded in batches and re-assembled on arrival.\"},{\"question\":\"\u62c6\u5206\u4f4d\u7f6e\u6309\u4ec0\u4e48\u6807\u51c6\u786e\u5b9a\uff1f \\\/ How are the split points chosen?\",\"answer\":\"\u6309\u5de5\u4f4d\u8fb9\u754c\uff0c\u4e0e\u88c5\u914d\u5de5\u5e8f\u987a\u5e8f\u4e00\u4e00\u5bf9\u5e94\uff1b\u6bb5\u95f4\u8fde\u7ebf\u4e0e\u6c14\u8def\u7559\u51fa\u4f59\u91cf\uff0c\u4fbf\u4e8e\u5230\u573a\u5bf9\u63a5\u3002 \\\/ At station boundaries, matching the assembly sequence; cables and air lines are left with slack for on-site reconnection.\"},{\"question\":\"\u8fd0\u8f93\u9014\u4e2d\u600e\u4e48\u9632\u6b62\u6a21\u5757\u4f4d\u79fb\uff1f \\\/ How are modules kept from shifting?\",\"answer\":\"\u6a21\u5757\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u3001\u68f1\u89d2\u52a0\u62a4\u89d2\uff1b\u88c5\u8f66\u6309\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03\uff0c\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u3002 \\\/ Stretch-wrapped with corner protectors; loading follows size and centre of gravity, lashing tensioned section by section.\"},{\"question\":\"\u89c6\u9891\u53ea\u6709 25 \u79d2\uff0c\u662f\u5b8c\u6574\u6d41\u7a0b\u5417\uff1f \\\/ Is the 25-second clip the full process?\",\"answer\":\"\u672c\u7247\u8bb0\u5f55\u7684\u662f\u5305\u8986\u3001\u540a\u88c5\u4e0e\u88c5\u8f66\u8fd9\u4e00\u6bb5\uff0c\u4e0d\u542b\u8bbe\u5907\u8c03\u8bd5\u4e0e\u5230\u573a\u590d\u88c5\u3002 \\\/ It covers wrapping, lifting and loading only, not commissioning or on-site re-assembly.\"},{\"question\":\"\u5982\u4f55\u8054\u7cfb\u4e45\u5de8\u4e86\u89e3\u88c5\u914d\u7ebf\u4ea4\u4ed8\uff1f \\\/ How can I ask about line delivery?\",\"answer\":\"\u53ef\u62e8\u6253 400-626-8699\uff0c\u6216\u53d1\u90ae\u4ef6\u81f3 zx@szjiuju.com\u3002 \\\/ Call +86 134-2897-6919 or email zx@szjiuju.com.\"}]"],"_geo_key_points":["[\"\u6309\u5de5\u4f4d\u8fb9\u754c\u62c6\u6210\u6a21\u5757 \\\/ Split at station boundaries\",\"\u7f20\u7ed5\u819c\u6574\u5377\u5305\u8986\u52a0\u62a4\u89d2 \\\/ Stretch-wrapped, corner protectors\",\"\u540a\u88c5\u7531\u8d1f\u8d23\u4eba\u7edf\u4e00\u6307\u6325 \\\/ One person directs the lift\",\"\u88c5\u8f66\u6309\u5c3a\u5bf8\u4e0e\u91cd\u5fc3\u6392\u5e03 \\\/ Loaded by size and centre of gravity\",\"\u7ed1\u5e26\u9010\u6bb5\u62c9\u7d27\u9632\u4f4d\u79fb \\\/ Lashed section by section\",\"\u5e73\u677f\u8f66\u4e0e\u96c6\u88c5\u7bb1\u63a5\u7eed\u88c5\u8fd0 \\\/ Flatbed and container in sequence\",\"\u5230\u573a\u6309\u5de5\u4f4d\u987a\u5e8f\u590d\u4f4d \\\/ Re-assembled in station order\",\"\u753b\u9762\u4e3a 25 \u79d2\u73b0\u573a\u8bb0\u5f55 \\\/ 25-second on-site record\"]"],"_geo_target_audience":["\u5587\u53ed\u4e0e\u626c\u58f0\u5668\u5236\u9020\u4f01\u4e1a\u7684\u4ea7\u7ebf\u89c4\u5212\u3001\u5de5\u827a\u5de5\u7a0b\u5e08\u53ca\u8bbe\u5907\u91c7\u8d2d\u8d1f\u8d23\u4eba \/ Production planners, process engineers and equipment buyers at loudspeaker manufacturers"],"_geo_manual_overrides":["[\"_geo_short_summary\",\"_geo_structured_desc\",\"_geo_faqs\",\"_geo_key_points\",\"_geo_target_audience\"]"],"_geo_last_modified":["2026-11-17T08:30:04+08:00"],"_geo_version":["1"],"_geo_has_data":["1"],"_thumbnail_id":["7837"]},"medium_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u50cf\u7d201000-300x300.jpg","thumbnail_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u50cf\u7d201000-150x150.jpg","full_url":"https:\/\/www.jiujuauto.com\/wp-content\/uploads\/2026\/11\/\u50cf\u7d201000.jpg","_links":{"self":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts\/7824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/comments?post=7824"}],"version-history":[{"count":0,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/posts\/7824\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/media\/7837"}],"wp:attachment":[{"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/media?parent=7824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/categories?post=7824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jiujuauto.com\/en\/wp-json\/wp\/v2\/tags?post=7824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}